Brickline Greenway: Forest Park Connector

St. Louis, MO

2026

OVERVIEW

Cortex MetroLink to Forest Park

The Clayton Avenue segment of the Brickline Greenway will connect the Cortex MetroLink Station to Forest Park along Boyle and Clayton Avenues. The team is coordinating trail design with street improvements, accessible crossings, planting, and drainage across a one-mile corridor serving nearby institutions and neighborhoods.

Client

Great Rivers Greenway District

Size

1 mile

Photography

Gaparazzi

Markets

Mobility

Parks & Open Space

At Boyle and Clayton Road

01 / THE GAP

A connection from transit to Forest Park

Workers, patients, students, and park visitors needed a continuous route between Cortex MetroLink and Forest Park.

The one-mile corridor along Boyle and Clayton Avenues passes Washington University School of Medicine, BJC HealthCare, Shriners Children’s, and the Cortex Innovation District. Those institutions sit close to transit and Forest Park, but pedestrians and cyclists lacked a continuous, legible connection between them.

The team needed to address street crossings and accessibility within a constrained public right-of-way, while coordinating with the institutions and agencies responsible for the corridor.

02 / THE SEED

Designing the trail and street together

The team is combining greenway design with improvements to intersections, drainage, and the public spaces along the route.

Street and intersection improvements address crossing locations and transitions along Boyle and Clayton Avenues. The team is coordinating accessible routes, planting, lighting, drainage, site furnishings, and signage as part of the corridor design.

Two locations receive particular attention: the turn at Boyle and Clayton, where nearby institutions converge, and the Forest Park approach at Kingshighway. The team is developing each as a recognizable place to pause and orient along the route.

Coordination includes City departments, MoDOT, Metro Transit, and adjacent institutional landowners. The work addresses transportation, utilities, property impacts, stormwater, and pedestrian safety across those interfaces.

03 / THE SPROUT

A planned link to Forest Park

Upon completion, walkers and cyclists will have a connected route from Cortex MetroLink to the park’s edge.

The team is preparing the one-mile connection as part of the larger Brickline Greenway network, with street and intersection improvements along the route.

Transit riders will be able to continue from Cortex MetroLink to Forest Park through a connected public corridor. Workers, patients, students, and park visitors will share the route and the gathering places along it.

COMMUNITY INPUT

Coordination across agencies and campuses

The design team led two public open houses, capturing input from local residents, political leaders, and aligned multiple institutions adjacent to the greenway alignment.

Project by the Numbers

Proposed corridor from Cortex MetroLink to Forest Park.

1

mile

Proposed corridor from Cortex MetroLink to Forest Park.

1

mile

Proposed corridor from Cortex MetroLink to Forest Park.

1

mile

Estimated Carbon Sequestration captured

11.5

Metric Tons CO2 / year

Estimated Carbon Sequestration captured

11.5

Metric Tons CO2 / year

Estimated Carbon Sequestration captured

11.5

Metric Tons CO2 / year

Lawn Converted

1.14

Acres

Lawn Converted

1.14

Acres

Lawn Converted

1.14

Acres

Details

Collaborators

Civil engineering

Lochmueller Group

Lighting designer

Introba

Landscape contractor

Vector Communications

Photography

Gaparazzi

Additional

MoDOT, Metro Transit, Washington School of Medicine, BJC Healthcare, Shringers Children's Hospital, Cortex Innovation District, Forest Park Forever