Brickline Greenway: Forest Park Connector
St. Louis, MO
2026
OVERVIEW
Cortex MetroLink to Forest Park
The Clayton Avenue segment of the Brickline Greenway will connect the Cortex MetroLink Station to Forest Park along Boyle and Clayton Avenues. The team is coordinating trail design with street improvements, accessible crossings, planting, and drainage across a one-mile corridor serving nearby institutions and neighborhoods.
Client
Great Rivers Greenway District
Size
1 mile
Photography
Gaparazzi
Markets
Mobility
Parks & Open Space

At Boyle and Clayton Road
01 / THE GAP
A connection from transit to Forest Park
Workers, patients, students, and park visitors needed a continuous route between Cortex MetroLink and Forest Park.
The one-mile corridor along Boyle and Clayton Avenues passes Washington University School of Medicine, BJC HealthCare, Shriners Children’s, and the Cortex Innovation District. Those institutions sit close to transit and Forest Park, but pedestrians and cyclists lacked a continuous, legible connection between them.
The team needed to address street crossings and accessibility within a constrained public right-of-way, while coordinating with the institutions and agencies responsible for the corridor.

02 / THE SEED
Designing the trail and street together
The team is combining greenway design with improvements to intersections, drainage, and the public spaces along the route.


Street and intersection improvements address crossing locations and transitions along Boyle and Clayton Avenues. The team is coordinating accessible routes, planting, lighting, drainage, site furnishings, and signage as part of the corridor design.
Two locations receive particular attention: the turn at Boyle and Clayton, where nearby institutions converge, and the Forest Park approach at Kingshighway. The team is developing each as a recognizable place to pause and orient along the route.
Coordination includes City departments, MoDOT, Metro Transit, and adjacent institutional landowners. The work addresses transportation, utilities, property impacts, stormwater, and pedestrian safety across those interfaces.

03 / THE SPROUT
A planned link to Forest Park
Upon completion, walkers and cyclists will have a connected route from Cortex MetroLink to the park’s edge.
The team is preparing the one-mile connection as part of the larger Brickline Greenway network, with street and intersection improvements along the route.
Transit riders will be able to continue from Cortex MetroLink to Forest Park through a connected public corridor. Workers, patients, students, and park visitors will share the route and the gathering places along it.

COMMUNITY INPUT
Coordination across agencies and campuses
The design team led two public open houses, capturing input from local residents, political leaders, and aligned multiple institutions adjacent to the greenway alignment.



Project by the Numbers
Details
Collaborators
Civil engineering
Lochmueller Group
Lighting designer
Introba
Landscape contractor
Vector Communications
Photography
Gaparazzi
Additional
MoDOT, Metro Transit, Washington School of Medicine, BJC Healthcare, Shringers Children's Hospital, Cortex Innovation District, Forest Park Forever