
Penn State University West Campus Transformation
University Park, PA
2023
OVERVIEW
The Quad and the Building. Designed as One.
The Penn State West Campus Transformation is not a building project with a landscape component. It is a campus precinct project — one that understood from the start that the 15-acre West Quadrangle and the 105,000 SF Engineering Design and Innovation Building would only succeed if they were designed as a single, continuous environment.
The landscape came first in the sequencing of questions. What does the quadrangle need to become for the building to have the right approach? Where do pedestrians need to move, and where do they need to pause? What outdoor spaces support the kind of informal collaboration that carries over from the building's interior — the critique that continues outside after a review, the group that needs a place to work between classes, the faculty member who wants to meet a student somewhere other than an office? The quadrangle answers all of these.
Client
Penn State University
Size
15 Acres
Photography
Denmarsh Photography
Markets
Higher Education

01 / THE GAP
A shared setting for engineering programs
Penn State needed to connect programs spread across several facilities.
Penn State's West Quadrangle was a campus precinct without coherence. Engineering design and manufacturing programs were fragmented across multiple facilities, limiting the interdisciplinary collaboration that defines contemporary engineering education. The quadrangle landscape between them was equally disconnected — an underperforming outdoor environment that neither unified the precinct nor served the community that depended on it daily.

02 / THE SEED
Learning spaces that extend outdoors
The team paired a transparent building with outdoor spaces across the quadrangle.


A transformative investment at two scales: a 105,000 SF innovation hub uniting SEDI, the Learning Factory, FAME Lab, maker spaces, and research facilities under one roof, alongside a reimagined 15-acre quadrangle that extends the culture of making, learning, and collaboration into the campus landscape. Building and landscape were conceived as a single integrated experience.
Guided by the philosophy of Learning on Display, the building reveals its activity from the moment of arrival. Along the east façade, an expansive glass-and-timber curtain wall showcases the processes of making, testing, critique, and discovery, while anodized copper aluminum panels frame the transparent structural system. The result is a seamless exchange between indoors and out, where the energy of the quadrangle animates the building and the building activates the landscape.
Across the quadrangle, a series of distinct outdoor destinations are defined through a rich material and planting palette. Each space is designed to support a specific mode of learning, gathering, or making while reinforcing the building’s collaborative mission.

03 / THE SPROUT
A connected engineering destination
The building and quadrangle provide shared spaces for making and study.
The pedestrian network was reimagined to improve safety, accessibility, and connectivity across the precinct, resolving circulation conflicts, strengthening links to adjacent campus zones, and establishing a clear hierarchy of paths that intuitively guides movement without reliance on signage. A diverse, seasonally expressive planting palette enriches the user experience, providing year-round interest while ensuring the quadrangle remains functional, legible, and inviting throughout the academic calendar.
The outcome is a transformed campus precinct where the West Quadrangle functions as a unified destination, creating an outdoor environment as purposeful as the building it frames and a building that is transparent, welcoming, and connected to the campus landscape.


Project by the Numbers
Gallery














Details
Collaborators
Architecture
Payette Associates, Inc.
Planning
Arup
Civil engineering
Herbert, Rowland & Grubic, Inc. (HRG)
Lighting designer
Barton Associates, Inc
General contractor
Whiting-Turner
Photography
Denmarsh Photography
Additional
Clayco, LJC Design and Engineering
Acknowledgement
Work Completed by the Kanopi Gap team while Employed at LJC Design & Engineering
