OVERVIEW

Returning What Was Taken Underground

Tower Grove Park was established in 1872. Its original plan included a stream that flowed continuously from south to north across the east end of the park. In 1910, that stream was buried — routed into an underground pipe and removed from the park’s landscape for over a century. The Nee Lee Nee project brought it back.

Daylighting a stream that has been underground for 100 years inside a National Historic Landmark is a technical challenge of significant complexity. The design team coordinated with the National Park Service throughout, ensuring that every element of the new stream design respected the park’s historic character and the integrity of the 1870s-era bridges through which the stream now flows. The new alignment closely mimics the original 1876 stream path — threading beneath five of the park’s historic stone bridges as if it had never left.

Client

Tower Grove Park

Size

3 AC / 43-Acre Watershed

Photography

Gaparazzi

Markets

Parks & Open Space

Civic and Cultural

01 / THE GAP

A buried waterway within a historic park

Tower Grove Park sought to restore a stream piped underground in 1910.

This historic stream had been buried in an underground pipe network since 1910. For over a century, a 43-acre watershed drained into the combined sewer system rather than flowing through the park as it was designed to do. The absence of the stream was an ecological loss and a cultural one.

02 / THE SEED

Restoring the alignment with historic and tribal guidance

The team followed the stream’s 1876 alignment beneath five historic bridges.

The project was developed in partnership with the Osage Nation, whose people were the original inhabitants of this land. Tribal guidance shaped the design process, and tribal artists have since worked with the park and the design team to develop animal depictions for future integration into the landscape. An ongoing relationship has been formed — one that extends beyond the project itself.

The stream closely mimics the stream’s original 1876 alignment while integrating bridge crossings, pathways, bioretention areas, nature play, and outdoor educational spaces. Five of the park’s 1870s-era bridges were threaded into the new stream alignment.

03 / THE SPROUT

Stormwater management within a restored stream

The project records completion in March 2022.

The stream and bioretention system are reported to retain 3.8 million gallons annually from the 43-acre watershed. Green infrastructure grants provided $1.4 million in support. The park’s partnership with the Osage Nation extends beyond construction.

COMMUNITY INPUT

An ongoing partnership with the Osage Nation

Park and design team have continued working with tribal artists on animal depictions for integration into the landscape. National Park Service coordination addressed historic preservation requirements

Project by the Numbers

Stream daylighting project footprint.

3

acres

Stream daylighting project footprint.

3

acres

Stream daylighting project footprint.

3

acres

Drainage area served by the stream and bioretention system.

43

acres

Drainage area served by the stream and bioretention system.

43

acres

Drainage area served by the stream and bioretention system.

43

acres

Annual stormwater retention described for the system.

3.8

million gallons/year

Annual stormwater retention described for the system.

3.8

million gallons/year

Annual stormwater retention described for the system.

3.8

million gallons/year

Details

Collaborators

Architecture

LJC Design and Engineering

Engagement

Osage Nation

Landscape contractor

DJM Ecological

Photography

Gaparazzi

Additional

National Park Service, Metropolitan Sewer District of St. Louis

Acknowledgement

Work Completed by the Kanopi Gap team while Employed at LJC Design & Engineering

Awards

Urban Land Institute

2023

Urban Land Institute

2023

ASLA Prairie Gateway Chapter

2023

ASLA Prairie Gateway Chapter

2023