Reinsurance Group of America Headquarters

Chesterfield, MO

2015

OVERVIEW

The Site Did the Work

RGA's Chesterfield headquarters begins with a decision most projects avoid: work with the land, not against it. The site on Swingley Ridge Road carries a 70-foot grade change across its footprint. Rather than flatten it, the design uses it. The slope conceals the majority of the 1,400-space parking structure below grade, freeing the upper campus for a building experience that reads as naturally situated rather than imposed.

Two linked office buildings sit above an amenity base that mediates the grade transition. The connection between buildings is not incidental — it is the organizing move that makes the campus function as one place. A 500-seat café, a 2,500 SF fitness facility, and state-of-the-art security infrastructure are embedded in that base, giving the campus a center of gravity that supports the full range of how RGA's people work.

Client

Reinsurance Group of America

Size

415,000 SF

Photography

Courtesy of Clayco

Markets

Workplace

The exterior of both towers takes its cue from the work that happens inside. RGA's actuarial practice is built on pattern recognition and mathematical precision. The façade responds in kind: an alternating pattern of fritted high-performance glass that reduces solar heat gain while maintaining natural light and long views for occupants. The pattern is not decorative. It is derived.

A central heating and cooling plant serves the entire campus, reducing overall energy use by 38% compared to conventional systems. Daylight harvesting supplements mechanical lighting throughout. The project achieved LEED Silver certification — and established a campus framework with a clear expansion zone for future growth phases.

Project by the Numbers

Reported office and amenity floor area.

415,000

square feet

Headquarters

Reported office and amenity floor area.

415,000

square feet

Headquarters

Reported office and amenity floor area.

415,000

square feet

Headquarters

Slope across the campus site.

70

feet

Site grade change

Slope across the campus site.

70

feet

Site grade change

Slope across the campus site.

70

feet

Site grade change

Reported overall project cost.

$150

million

Construction cost

Reported overall project cost.

$150

million

Construction cost

Reported overall project cost.

$150

million

Construction cost

Gallery

var(--variable-tayj4Hz84)
var(--variable-DG1rVeXPn)
var(--variable-DwcfxlCGo)
var(--variable-N3Zl6ljAG)
var(--variable-aPsq1ku4w)
var(--variable-w1japuM_U)
var(--variable-iBhY3Gfww)
var(--variable-dgX3dQCwi)
var(--variable-z2ldpsWNe)
var(--variable-DQCQzp5r2)
var(--variable-KAZvixQAX)
var(--variable-OgQlGDHCM)

Details

Collaborators

Architecture

Gensler

Structural

Alper Audi

Civil engineering

Stock and Associates

Lighting designer

Randy Burkett Lighting Design

General contractor

Clayco

Photography

Courtesy of Clayco

Additional

Fox Architects

Acknowledgement

Work Completed by the Kanopi Gap team while Employed at LJC Design & Engineering

Awards

ASLA Central States

2017

ASLA Central States

2017

ASLA St. Louis Chapter

2017

ASLA St. Louis Chapter

2017

DBIA Mid-America

2015

DBIA Mid-America

2015